Home
All Projects
GOVERNMENT EVALUATION

Livestock Scheme Evaluation

A policy impact evaluation for the Government of Gujarat — measuring income impact, scheme effectiveness, and operational gaps across 12 districts and 655+ stakeholders.

655+Stakeholders surveyed
28.4%Average income increase
12Districts covered
p < 0.05Statistical significance
RPower BIExcelMann-Whitney U TestSurvey SamplingImpact EvaluationHypothesis Testing

Overview

The Government of Gujarat launched a scheme to modernize livestock keeping through training and motivational tours. As part of the Directorate of Evaluation, I was responsible for designing the statistical sampling framework, conducting analysis in R, developing Power BI dashboards, and generating policy recommendations — covering 482 beneficiaries, 98 non-beneficiaries, 27 trainers, 36 livestock inspectors, and 12 deputy directors across 12 Gujarat districts.

Problem Statement

  • Was the scheme actually improving livestock keeper incomes?
  • Were beneficiaries performing better than non-beneficiaries?
  • What were the scheme's operational gaps and barriers to access?
  • Which communication channels were most effective for outreach?
  • What changes would improve scheme outcomes?

Data & Analysis

Monthly income — beneficiaries vs non-beneficiaries (₹)

Scheme Financial Audit Outcomes

Beneficiaries earn 3.1× more than non-beneficiaries

Primary scheme awareness channel (%)

Beneficiary Information Sources

Awareness gap analysis

Potential vs Actual Scheme Enrollment

65.3%Non-beneficiaries aware of scheme
34.7%Still not enrolled despite awareness
Aware of Scheme (65.3%)Not Enrolled (34.7%)
Awareness-to-enrollment gap

Veterinary information vs treatment action gap

Key Operational Implementation Gaps

99.37%Received veterinary information
10.51%Had diagnosed diseases actually treated
Critical implementation gap: information reached beneficiaries but veterinary treatment follow-through remained extremely low.

Key Findings

₹8,425

Monthly income increase

Beneficiaries gained ₹8,425/month on average — a statistically significant 28.4% rise confirmed by Mann-Whitney U test (p < 0.05).

3.1×

Income differential

Beneficiaries earned 3.1 times more per month than surveyed non-beneficiaries (₹29,694 vs ₹9,510).

57.8%

Key channel identified

Livestock Inspectors were the dominant awareness channel — making them the highest-leverage point for outreach expansion.

10.51%

Critical treatment gap

Despite 99.37% receiving veterinary information, only 10.51% of diagnosed animals were treated — a major implementation failure.

Policy Recommendations

Short-term

  • Simplify enrollment through the I-Khedut portal
  • Introduce ₹700/day stipend to offset lost wages during training
  • Expand Livestock Inspector outreach program
  • Improve application accessibility at village level

Long-term

  • Deploy mobile training units to reach distant villages
  • Extend training duration from 2 days to 3–5 days
  • Digitize beneficiary monitoring and tracking
  • Establish post-training veterinary support systems

Skills Demonstrated

Statistical AnalysisSurvey SamplingImpact EvaluationPublic Policy AnalyticsDashboard DevelopmentPower BIRHypothesis TestingMann-Whitney U TestResearch MethodologyEvidence-Based PolicyStakeholder Analysis